RAUmPlan - Repository of Architecture, Urbanism and Planning
Institute of Architecture and Urban & Spatial Planning of Serbia
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   RAUmPlan
  • RAUmPlan
  • Radovi istraživača / Researchers' publications
  • View Item
  •   RAUmPlan
  • RAUmPlan
  • Radovi istraživača / Researchers' publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Key Business Risks in the Mining Development in the Bor Basin of Copper

Thumbnail
2011
Conference_on_Mining_and_Metallurgy_2011.pdf (7.957Mb)
Authors
Zeković, Slavka
Vujošević, Miodrag
Conference object (Published version)
Metadata
Show full item record
Abstract
The paper gives an overview of the global business risks and risks in the mining development and the possible impact they could have on the future development of the Bor basin of copper. Risks in the further development of mining are emphasized by global economic and financial crisis. An identification of main risks is undertaken by application of a comprehensive development framework approach. Paper indicates that an evaluation of possible impacts of risks on the future development of Bor basin shows that these impacts must be included in corporative decision and compilation plans on the local and regional level.
Keywords:
business risks / mining / recovery, restructuring and privatization / Bor Basin of Copper
Source:
Proceedings of the 43rd International October Conference on Mining and Metallurgy, 2011, 428-432
Publisher:
  • Bor : University of Belgrade, Technical Faculty in Bor
Funding / projects:
  • Sustainable spatial development of Danube area in Serbia (RS-36036)
Note:
  • 43rd International October Conference on Mining and Metallurgy, IOCMM ; 12- 15 October 2011; Kladovo Editors: Desimir Marković, Dragana Živković, Svetlana Nestorović
  • Editors: Desimir Marković, Dragana Živković, Svetlana Nestorović

ISBN: 978-86-80987-87-3

[ Google Scholar ]
Handle
https://hdl.handle.net/21.15107/rcub_raumplan_377
URI
https://raumplan.iaus.ac.rs/handle/123456789/377
Collections
  • Radovi istraživača / Researchers' publications
Group
RAUmPlan
TY  - CONF
AU  - Zeković, Slavka
AU  - Vujošević, Miodrag
PY  - 2011
UR  - https://raumplan.iaus.ac.rs/handle/123456789/377
AB  - The paper gives an overview of the global business risks and risks in the mining development and the possible impact they could have on the future development of the Bor basin of copper. Risks in the further development of mining are emphasized by global economic and financial crisis. An identification of main risks is undertaken by application of a comprehensive development framework approach. Paper indicates that an evaluation of possible impacts of risks on the future development of Bor basin shows that these impacts must be included in corporative decision and compilation plans on the local and regional level.
PB  - Bor : University of Belgrade, Technical Faculty in Bor
C3  - Proceedings of the 43rd International October Conference on Mining and Metallurgy
T1  - Key Business Risks in the Mining Development in the Bor Basin of Copper
SP  - 428
EP  - 432
ER  - 
@conference{
author = "Zeković, Slavka and Vujošević, Miodrag",
year = "2011",
abstract = "The paper gives an overview of the global business risks and risks in the mining development and the possible impact they could have on the future development of the Bor basin of copper. Risks in the further development of mining are emphasized by global economic and financial crisis. An identification of main risks is undertaken by application of a comprehensive development framework approach. Paper indicates that an evaluation of possible impacts of risks on the future development of Bor basin shows that these impacts must be included in corporative decision and compilation plans on the local and regional level.",
publisher = "Bor : University of Belgrade, Technical Faculty in Bor",
journal = "Proceedings of the 43rd International October Conference on Mining and Metallurgy",
title = "Key Business Risks in the Mining Development in the Bor Basin of Copper",
pages = "428-432"
}
Zeković, S.,& Vujošević, M.. (2011). Key Business Risks in the Mining Development in the Bor Basin of Copper. in Proceedings of the 43rd International October Conference on Mining and Metallurgy
Bor : University of Belgrade, Technical Faculty in Bor., 428-432.
Zeković S, Vujošević M. Key Business Risks in the Mining Development in the Bor Basin of Copper. in Proceedings of the 43rd International October Conference on Mining and Metallurgy. 2011;:428-432..
Zeković, Slavka, Vujošević, Miodrag, "Key Business Risks in the Mining Development in the Bor Basin of Copper" in Proceedings of the 43rd International October Conference on Mining and Metallurgy (2011):428-432.

DSpace software copyright © 2002-2015  DuraSpace
About RAUmPlan - Repository of Architecture, Urbanism and Planning | Send Feedback

OpenAIRERCUB
 

 

All of DSpaceGroupsAuthorsTitlesSubjectsThis collectionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About RAUmPlan - Repository of Architecture, Urbanism and Planning | Send Feedback

OpenAIRERCUB